E24064 / E24065 / E24066 Centennial Flats Solar Phases 1, 2, & 3
Address: 51801 Sore Finger Rd, Salome, AZ 85348
The present work schedule is Monday through Friday. (Saturday for some of the crew, 8-hour days)
Start Time: 6:30 AM
Break: 9:00 AM - 9:15 AM
Lunch: 11:30 AM - 12:00 PM
Quitting Time: 4 PM, 3 PM on Friday
Address: 51801 Sore Finger Rd, Salome, AZ 85348
The present work schedule is Monday through Friday.
(Saturday for some of the crew, 8-hour days)
Start Time: 6:30 AM
Break: 9:00 AM - 9:15 AM
Lunch: 11:30 AM - 12:00 PM
Quitting Time: 4:00 PM / 3:00 PM on Friday
Start times are in your assigned work area.
Quitting Times are leaving your work area. No one picks up more than 10 minutes before quitting time and EVERYONE helps everyone else.
Remember: We are a TEAM!
Contact Info:
Construction Manager: Chris Curtis Phone: 303-819-4682
Project Manager: Wayne Howells Phone: 719-761-9248
Project Coordinator:Â Ally Nelson Phone: 303-952-1124
Director of Education and LP: Ted Smith Phone: 303-550-5292
Safety Superintendent: Keith Lang Phone: 720-948-7482
Â
The emergency telephone number is 911.
SAFETY COMES FIRST - Report any unsafe condition to your supervisor. We will adhere to all company and safety policies, also OSHA standards in temporary electric and general safety requirements.
Â
Report ALLÂ injuries to your FOREMANÂ or project Supervisor immediately.
Call Keith Lang at 720-948-7482, if you get voice mail, hang up and call again immediately – the phone will be answered.
Housekeeping /clean-up will be required by all employees on a daily basis.
 Safety glasses, hard hats and warning vests are to be worn at all times on the jobsite.
 100% natural fiber clothing is recommended, and sleeves must go to at least the elbow.
ALL SAFETY POLICIES ARE ENFORCED ON THIS SITE.
Â
MSDS information is available at online at ww.elightinformation.com
Safety Glasses and hard hats (Type II Class E) are to be worn at all times on the jobsite.
PLEASE NOTE ALL EMPLOYEES MUST HAVE THEIR DRUG SCREEN CHAIN OF CUSTODY IN ORDER TO ENTER THE SITE FOR ORIENTATION.
Jobsite orientation is 7:30 AM on the first day, employees are expected to be there at least 15 minutes early and employees are expected to report to the superintendent.
NO HOT WORK.
Â
Keep personal tools on site or in gang boxes at your own risk.Â
All tools need to be returned to carrying cases.Â
Gang boxes need to be kept closed and unused tools put away.
Call your Hard Hat Representative if sick or late prior to start work time.
Safety meetings are at office trailer on once a week. Day of week is TBD.
Daily stretch and flex at the E Light Trailer, with the exception of Monday.
Monday all hands at the McCarthy Trailer.
SOME INSTALLATION PERTICULARS:
Â
All conductors to be labeled at all boxes.
Â
Color Code:
120/208V 3 phase 4 wire                               1500VDC
Black                                                                Positive / Negative
Red                                                                   Positive = Red
Blue                                                                  Negative = Black
White                                                                Â
Green                                                              Â
All work will only be done once and must look clean. All work must be inspected by E Light QC Department.     Â
It is understood that any inappropriate action (i.e., whistling, cat calling, etc.), is grounds for immediate dismissal from the project for its duration.
Â
No member of the Contractor or Subcontractor’s personnel is allowed to communicate with any member of any type of media about this project. All requests for response to the media are to be directed to the Contractor’s Project Manager or Superintendent, who will elevate the request to the General Contractor.
The use of and posting to social media on or about the project is prohibited.
If you have any questions, or you are not sure about something, stop and ask. Mistakes cost money and waste time.
THINK SAFE & WORK SAFE!
Record Documents:
Â
During construction, the contractor shall maintain the job site a set of updated construction documents for the singular purpose of recording changes as the job progresses.Â
All record drawings shall be completed in erasable pencil, these changes shall be updated weekly.
Revisions to the Contract Documents shall be legible and shall be prepared using the following color scheme:
Red shall indicate new items, deviations, and routing.
Green shall indicate items removed or deleted. Do not use white-out.
Blue shall be used for relevant notes and descriptions.
Â
Your foreman will provide you with the following: tools, materials, layout and a safe work environment. If you feel you are missing any of these items, see foreman personally.
ALL ENERGIZED WORK MUST BE DONE BY QUALIFIED PERSONNEL AFTER RECEIVING WRITTEN APPROVAL FROM ALL OF THE FOLLOWING:Â
Construction Manager
Project Manager
Department Director
Director of Education and Loss Prevention