E24064 / E24065 / E24066 Centennial Flats Solar Phases 1, 2, & 3

E24064 / E24065 / E24066 Centennial Flats Solar Phases 1, 2, & 3

GENERAL INFORMATION:

Job Address: 51801 Sore Finger Rd, Salome, AZ 85348

The present work schedule is Monday through Friday.

Start Time: 7:00 AM
Break: 9:30AM
Lunch: 12:00PM-12:30PM
Quitting Time: 3:30 PM

Start Times are in your assigned work area.

Quitting Times are leaving your work area. No one picks up more than 10 minutes before Quitting time and EVERYONE helps everyone else.

Remember: We are a TEAM!


E24064 / E24065 / E24066 Centennial Flats Solar Phases 1, 2, & 3


GENERAL INFORMATION:


Job Address: 51801 Sore Finger Rd, Salome, AZ 85348


The present work schedule is Monday through Friday.


Start Time: 7:00 AM

Break: 9:30 AM

Lunch: 12:00 PM - 12:30 PM

Quitting Time: 3:30 PM


  • Start Times are in your assigned work area.

  • Quitting Times are leaving your work area.

  • No one picks up more than 10 minutes before Quitting time and EVERYONE helps everyone else.


Remember: We are a TEAM!



Contact Info:


Construction Manager: Chris Curtis P: 303-819-4682


Project Manager: Wayne Howells P: 719-761-9248


Project Coordinator: Ally Nelson P:  303-952-1124


Director of Education and LP: Ted Smith P: 303-550-5292


Safety Superintendent: Todd Kreps P: 720-948-7842

 

The emergency telephone number is 911.


SAFETY COMES FIRST - Report any unsafe condition to your supervisor. We will adhere to all company and safety policies, also OSHA standards in temporary electric and general safety requirements.

 

  • Report ALL injuries to your FOREMAN or project Supervisor immediately.

  • Housekeeping /clean-up will be required by all employees on a daily basis.

  •  Safety glasses, hard hats and warning vests are to be worn at all times on the jobsite.

  •  100% natural fiber clothing is recommended, and sleeves must go to at least the elbow.



ALL SAFETY POLICIES ARE ENFORCED ON THIS SITE.

 

  • MSDS information is available at online at ww.elightinformation.com

  • Safety Glasses and hard hats (Type II Class E) are to be worn at all times on the jobsite.

  • PLEASE NOTE ALL EMPLOYEES MUST HAVE THEIR DRUG SCREEN CHAIN OF CUSTODY IN ORDER TO ENTER THE SITE FOR ORIENTATION.

  • Jobsite orientation is 7:30 AM on the first day, employees are expected to be there at least 15 minutes early and employees are expected to report to the superintendent.



NO HOT WORK.

 

  • Keep personal tools on site or in gang boxes at your own risk. 

  • All tools need to be returned to carrying cases. 

  • Gang boxes need to be kept closed and unused tools put away.

  • Call your Hard Hat Representative if sick or late prior to start work time.

  • Safety meetings are at office trailer on once a week. Day of week is TBD.

  • Daily stretch and flex at the McCarthy Trailer



SOME INSTALLATION PERTICULARS:

 

All conductors to be labeled at all boxes.

 

Color Code:

120/208V 3 phase 4 wire                                1500VDC

Black                                                                 Positive / Negative

Red                                                                    Positive = Red

Blue                                                                   Negative = Black

White                                                                  

Green                                                               



All work will only be done once and must look clean. All work must be inspected by E Light QC Department.      



It is understood that any inappropriate action (i.e., whistling, cat calling, etc.), is grounds for immediate dismissal from the project for its duration.

 

No member of the Contractor or Subcontractor’s personnel is allowed to communicate with any member of any type of media about this project. All requests for response to the media are to be directed to the Contractor’s Project Manager or Superintendent, who will elevate the request to the General Contractor.


The use of and posting to social media on or about the project is prohibited.


If you have any questions, or you are not sure about something, stop and ask. Mistakes cost money and waste time.


THINK SAFE & WORK SAFE!



Record Documents:

 

During construction, the contractor shall maintain the job site a set of updated construction documents for the singular purpose of recording changes as the job progresses. 


All record drawings shall be completed in erasable pencil, these changes shall be updated weekly.


Revisions to the Contract Documents shall be legible and shall be prepared using the following color scheme:


  • Red shall indicate new items, deviations, and routing.

  • Green shall indicate items removed or deleted. Do not use white-out.

  • Blue shall be used for relevant notes and descriptions.

 

Your foreman will provide you with the following: tools, materials, layout and a safe work environment. If you feel you are missing any of these items, see foreman personally.



ALL ENERGIZED WORK MUST BE DONE BY QUALIFIED PERSONNEL AFTER RECEIVING WRITTEN APPROVAL FROM ALL OF THE FOLLOWING: 

  • Construction Manager

  • Project Manager

  • Department Director

  • Director of Education and Loss Prevention